Andy-OK. So we did like filming stuff, I.e The office scene and our running shots. But! Our office scene was deleted somehow on the camera so we cannot upload any samples from that. We have our running shots buts we want to redo them as there is not enough light in them so the camera is struggling to handle the lack of light. So were going to redo them in the near future. After we have done all the shots again with adjusted lighting we will try and upload some samples to the blog. A lesson has been learnt.
Jack-We are looking to film on monday (15/02). With our previous experience we should be more efficient this time round.
Will- hey
Friday, 12 February 2010
Sunday, 7 February 2010
Music with video
I am currently working on our thriller soundtrack on Cubase 4 at school and home. I have the main structure and a thorough idea of the sound track but wish to attempt to synchronize it with our actual film footage. Obviously this can only be done when the filming has finished. I can use cubase to do this. And by synchronizing I mean maybe clashes or staccato hits when a head is turned side to side e.t.c.
Thursday, 4 February 2010
Reminisce on last nights filming
We didn't finish all our filming but we done some.
We recorded the office scene which was actually going to be used in our thriller, however somehow it got overwritten.
All of the outside scenes probably need retaking. The light was OK however we needed more of it. So next time we will bring torches, flashlights etc..
When I get home I will try and upload what we achieved.
We recorded the office scene which was actually going to be used in our thriller, however somehow it got overwritten.
All of the outside scenes probably need retaking. The light was OK however we needed more of it. So next time we will bring torches, flashlights etc..
When I get home I will try and upload what we achieved.
Wednesday, 3 February 2010
Filming Timetable
4.00- Organize Office ready for filming. i. e Lighting, Prop positioning and Health and safety issues.
4.30- Start filming first scene taking 3 takes of each shot. look through shots.
5.30- Organize outside scenes. E.g health and safety.
6.00- Film at least 3 takes of each shot. We will be filming outside as it will be darker and suits our needs.
7.00- Look through shots.
4.30- Start filming first scene taking 3 takes of each shot. look through shots.
5.30- Organize outside scenes. E.g health and safety.
6.00- Film at least 3 takes of each shot. We will be filming outside as it will be darker and suits our needs.
7.00- Look through shots.
Movie so far!
Last time I showed the candidate part of the movie, but we have progressed and here is the beginning of the title credits:
Filming!!
We are hoping to film tonight in newport. We would be more than happy if we could do it all tonight. We are signing one of the school cameras out and will be hopefully returning it in the next week or two :)
Subscribe to:
Comments (Atom)
